Dock Tower Bridge G Repairs - Houston, Texas
CLIENT
Cargill, Inc.
Ibberson was awarded the contract to provide engineering and construction services for the repair and replacement structural members on Bridge “G”.
Scope of work included the design of a temporary truss. The temporary truss allowed the owner to continue operations without any interruptions. The truss was first fabricated in the staging area, then hoisted into place and secured to the top of the structure. This allowed for the replacement of structural members that had significant signs of rust and or corrosion while still supporting the conveyor below.